MOORING AND UNMOORING SERVICE CHANGE FOR THE PORT OF SANTA CRUZ DE TENERIFE
             
G.T. WORKING DAYS SATURDAY 12.00-24.00
07.00-19.00 19.00-7.00 PUBLIC HOLIDAYS AND SUNDAYS
0 - 1,000 26.12 52.20 52,20
1,001 - 2,000 38,35 76,68 76,68
2,001 - 5,000 47,66 95,33 95,33
5,001 -10,000 71,98 144,00 144,00
10,001 -15,000 109,74 219,44 219,44
15,001 -25,000 134,52 269,05 269,05
25,001 - 50,000 184,43 368,82 368,82
50,001 - 100,000 274,24 548,43 548,43
Over 100,000 365,70 731,38 731,38
50% SURCHARGE FOR 1-4 EXTRA HAWSERS OVER AND ABOVE 8
50% SURCHARGE FOR METAL MOORINGS
             

Answers to the queries made about this charge:

1. First line ashore:

This operation consists of sending the mooring service provider craft a first line ashore. This manoeuvre aids vessel berthing, and may be requested by the pilot and subsequently carried out with the consent of the captain.

The mooring service must be provided by suitable vessels to ensure the service is carried out under safe, quality conditions. Thus, the service indicated may not be charged in the same way as securing a normal line nor may any other additional charges or surcharges be applied for a first line ashore. 2. Mooring manoeuvres on buoys and dolphins in which vessels are needed to carry out the operation.

This operation consists of sending the mooring service provider craft a line which is secured to a buoy or dolphin on the corresponding berth.
As double the amount of staff are required to carry out these operations (at sea and on land), the surcharge for mooring to a buoy or dolphin is 100% of the charge applied for securing 8 lines ashore. The same scale approved in the previous charges will be applied.

This charge is per line secured at each buoy or dolphin. If extra hawsers are required to reinforce a line at a buoy or dolphin, the additional extra hawser surcharge indicated in the approved charges (50% surcharge up to a maximum of 4 hawsers, 100% surcharge for every additional hawser over 4 will be applied).
This charge shall also be applied for unmooring the lines secured to buoys or dolphins (or extra hawsers to reinforce moorings to which a surcharge is applied, as mentioned above).3. These charges shall be applied to the public holidays listed as such in the yearly working day calendar issued by the Santa Cruz de Tenerife Regional Labour Directorate.

             

Santa Cruz de Tenerife Official Provincial Gazette, No. 38, Monday 18th March 2013

Copyright © 2009 Puertos de Tenerife

log ministero